Emergency breakdown support | Call 0330 9000 247

Harmonic Data Logger Hire

PQ-BOX 150 Power Quality Network Analyser & Transient – Available for Rent

PQ-BOX 150 Power Quality Network Analyser & Transient Recorder designed for low-, medium- & high-voltage networks. PQ-BOX 150 is a powerful, portable, network analyser, data output meter & transient meter all in one robust instrument providing full reports to G5/5 legislation

  • G5 / 5 & G5/4-1 Compliance Assessments
  • Load profile/trends on mains supply
  • Confirms efficiency and possible cost reduction opportunities
  • Harmonic & PFC/ Power quality-related problems
  • Fault investigation
  • Power Quality health check
G5 / 5 & G5/4-1 Compliance Assessments Fault Investigation Power Quality Health Check

WHAT IS A HARMONIC DATA LOGGER?

An electronic device that monitors both grid mains voltage and current, these can suit most configurations such as 3 phase and neutral, split or single-phase supplies.

There are 2 main types of logging depending on either G5/4 or G5/5 requirements, the main difference being G5/5 requires high frequency band logging to allow up to the 100th harmonic level. G5/4 requests to the 50th harmonic level.

G5/4 is used for existing installation, G5/5 for new (in general). The loggers not only record the voltage and current data, but also download into its own reporting software.

Harmonic Data Logger with protective equipment case

WHY USE A HARMONIC DATA LOGGER?

01

To check existing mains health and harmonic levels, for either existing or new installations

02

Switching devices such as LED lighting and VSD motor controllers can cause harmonics and effect mains supplies, when adding these types of loads, the logger can be used to determine the mains are still within specifications required

03

To prolong equipment life, by reducing harmonics and heat dissipation

WHAT WE OFFER

We can offer harmonic data loggers for both G5/4 (50th harmonic) and G5/5 (100th harmonic) accordingly, these state-of-the-art loggers allow simple and easy reporting from the logger’s software (via PC / Laptop) and offer simple, safe connection options.

Enquire Now

How we work

From Enquiry
to Installation

Simple, straightforward and supported every step of the way.

Talk to an Engineer
01

Enquiry

Tell us about your equipment requirements or project.

02

Engineering Consultation

Whether you know exactly what you need or require technical guidance, our engineers will recommend the right hire solution.

03

Tailored Proposal

Receive a quotation covering equipment, delivery, installation and any supporting hire equipment required.

04

Delivery & Installation

Our team delivers, installs and commissions your hire equipment to get you operational quickly.

05

Support Throughout Your Hire

Technical support remains available throughout your hire period, with collection arranged when your project is complete.

SUPPORTING EQUIPMENT

A Complete Hire Solution

Our engineers don't just supply generators. We design complete temporary power packages using supporting hire equipment to deliver a safe, reliable and application-specific solution.

Variable Speed Drive

Maintain control of critical motors and processes during planned works or breakdowns.

Distribution Board

Safely distribute incoming power and connect temporary equipment with confidence.

Transformer

Match voltage requirements and integrate temporary power into existing installations.

Sine & Harmonic Filters

Protect motors and improve output quality for sensitive applications.

READY TO TALK

Need Temporary Power?

Complete the form and our engineering team will be in touch to discuss your requirements and provide a tailored quotation.

Name(Required)
Include the equipment you need, project details, location, hire duration or any questions. If you're unsure, our engineers are happy to help.